Move-in ready in JVC
- Community
- Jumeirah Village Circle
- Unit types
- Studio · 1 BR · 2 BR
- Completion
- Q3 2026Developer's estimate
- Status
- Available
Luxor is a residential building by Imtiaz Developments in Jumeirah Village Circle, the Nakheel master community that attracts families with its parks, schools and clinics and sits roughly 15 minutes from Sheikh Zayed Road. The developer reports construction at 90%, with structure complete and finishing and MEP works in their final stages against a stated completion of Q3 2026, so this is close to a ready purchase rather than a long off-plan wait. The unit mix runs from studios through one-bedroom to two-bedroom layouts, each with a published floor plan and area.
Every apartment is handed over fully furnished. The specification is detailed: Bosch appliances, Grohe purified and sparkling water taps, Alexa smart-home control, a 65-inch Samsung television, Fondovalle Italian tiles and branded sanitary ware. Studios run from 388 to 451 sq ft in total, one-beds from 730 to 951 sq ft and two-beds from 1,040 to 1,295 sq ft, balconies included. The building adds a rooftop pool, gym, sauna and steam rooms, clubhouse, business centre, theatre room, sky garden, kids' pool and playground, BBQ areas, EV charging and visitor parking.
The developer's payment plan is 20% on booking, 40% in instalments during construction and 40% on completion; with the building at 90%, most of the construction-linked instalments fall within a short period, so ask for the dated schedule for the unit you are considering. No starting price is published on the project page, and Wincasa sends the current developer price list on request. Buyers reserve through Wincasa Properties at the developer's price list, contract directly with Imtiaz Developments and pay into the project's escrow account under Dubai Land Department rules.

Interior
Image 1 of 11
Exterior
Image 1 of 8
Renders and photographs supplied by the developer; finishes may differ at handover.
Amenities
Fully furnished
Clubhouse
Fully equipped gym
Sauna and steam rooms
Kids' playground
Kids' zone
Jacuzzi
Sitting areas
BBQ area
Unit types
Type a
1 / 6
Typical layouts as published by the developer. Exact areas vary by floor and release — Wincasa confirms the plan for any specific unit before booking.
Construction progress
90%
overall
Estimated completion date
Q3 2026
Progress percentages and the completion estimate for Luxor by Imtiaz are published by Imtiaz Developments and reproduced here by Wincasa as a guide only. They are updated by the developer, may change without notice and are not a guarantee of the handover date.

Sub-structure
Super-structure
MEP Works
Finishing Works
Property location
Nearby
- Sheikh Zayed Road15 min
- Jumeirah Village Triangle
- Dubai Sports City
- Dubai Production City
- The Springs
Approximate driving times, as published by the developer.
Payment plan
20% on booking, 40% in instalments during construction, 40% on completion.
20%
On booking
40%
During construction
Paid in instalments
40%
On completion
Balance at handover
Instalments are paid to the developer's escrow account under Dubai Land Department rules. Wincasa LLC handles the reservation and paperwork and charges the buyer nothing for it.