Skip to content
Imtiaz Developments — developer of the projectsmarketed byWincasa PropertiesAuthorised Sales Partner — Imtiaz Developments

The Symphony by Imtiaz

Developed by Imtiaz Developments · Sold by Wincasa LLC

Curves over the lagoons

Community
Meydan Horizon
Unit types
1 BR · 2 BR · 3 BR · 4 BR · Duplex
Completion
Q2 2029Developer's estimate
Status
Available

The Symphony is a high-rise mixed-use tower in Meydan Horizon that Imtiaz Developments is building with Zaha Hadid Architects, the practice whose flowing, curved forms are recognisable at a glance. The building stacks two basements, a ground floor and five podium levels beneath 34 storeys and a roof; offices occupy floors 2 to 8, residences run from floor 10 to 34, and each has its own lift banks and entrances. In total there are 290 apartments, 84 offices and seven retail units. The residential mix runs from master one-bedroom suites and one-bedroom apartments through two-, three- and four-bedroom homes to a small number of four-bedroom duplexes.

The amenity list is long and spread across an indoor amenities floor and landscaped decks: adult and children's pools with wet and dry sun decks and a lifeguard station, a gym and an outdoor gym, a Pilates area with reformers, yoga indoors and out, sauna and steam, a clubhouse, a library the developer calls Reader's Cove, work stations, an executive lounge and dining room, prayer rooms, an observatory deck, a lagoon viewing lounge and terrace, water and terrace gardens with fire pits, a billiards table and an outdoor games area.

Meydan Horizon is a 21.5 million sq ft masterplan with four crystal lagoons and a wildlife sanctuary next door, reached from Al Khail Road and Al Ain Road, with Downtown Dubai, Dubai Design District, Business Bay and Dubai International Airport minutes away and a metro station planned nearby. Ground has been broken and the developer reports 5% overall progress against its stated completion of Q2 2029. Payment is 20% on booking, staggered instalments across 2026 to 2028, and 40% at completion. You reserve through Wincasa Properties, contract with Imtiaz Developments and pay into the developer's DLD escrow account at the developer's prices.

The Symphony by Imtiaz — overview

Interior

Image 1 of 12

Exterior

Image 1 of 9

Renders and photographs supplied by the developer; finishes may differ at handover.

Amenities

  • Sauna & Steam

  • Outdoor Dining

  • Adult Pool

  • Kids' pool

  • BBQ Area

  • Kids' playground

  • Outdoor Gym

  • Gym

  • Clubhouse

  • Outdoor Yoga

  • Yoga Studio

  • Observatory Deck

  • Outdoor Gaming Area

  • Sun Lounges

  • Seating Corners

  • Wet and Dry Sun Decks

  • Pool Loungers

  • Lifeguard Station

  • Swing Lounges

  • Viewing Garden

  • Banquet Seating

  • Outdoor Fire Pit Lounge

  • Locker Area

  • Multipurpose Gathering Area

  • Viewing Deck

  • Indoor Lounge Area

  • Billiards Table

  • Library

  • Work Stations

  • Pilates Area

  • Fire Pit

  • Reading Corners

  • Wet Pantries

  • Prayer rooms (male and female)

  • Executive Lounge

  • Executive Dining

  • Indoor & Outdoor Dining

  • Lagoon Viewing Lounge

  • Courtyard Dining

  • Terrace Garden with Fire Pit

  • Bar Seating

  • Water Garden

  • Lagoon Viewing Terrace

  • Smoking Break Areas

  • Shared restrooms

Construction progress

Estimated completion date

Q2 2029

Progress percentages and the completion estimate for The Symphony by Imtiaz are published by Imtiaz Developments and reproduced here by Wincasa as a guide only. They are updated by the developer, may change without notice and are not a guarantee of the handover date.

The Symphony by Imtiaz — construction site

Sub-structure

Super-structure

MEP Works

Finishing Works

Property location

Nearby

  • Downtown Dubai
  • Dubai Design District (D3)
  • Business Bay
  • Dubai International Airport
  • Al Khail Road
  • Planned metro station

Approximate driving times, as published by the developer.

Payment plan

20% on booking; staggered instalments across 2026 to 2028; 40% at completion in Q2 2029

  1. 20%

    On booking

  2. 40%

    During construction

    Staggered instalments between 2026 and 2028; dates confirmed per unit

  3. 40%

    On completion

    Developer's stated completion Q2 2029

Instalments are paid to the developer's escrow account under Dubai Land Department rules. Wincasa LLC handles the reservation and paperwork and charges the buyer nothing for it.

Frequently asked questions

Register your
interest

Tell Wincasa which unit type and budget you have in mind for The Symphony by Imtiaz and a consultant will reply with availability, the developer's payment plan and the next steps to reserve — at the developer's price, with independent advice from first call to handover.

Register your interest

Mobile *
or WhatsApp us

Your enquiry is received and answered by Wincasa Properties (Wincasa LLC), authorised sales partner. It is not sent to the developer.